DESIGN AND PRODUCTION OF NON-STANDARD EQUIPMENT AND STRUCTURES

Projects

Endless line with the containers was sent to the fish processing plant in Ecuador. We have produced 10 transporters, 5 containers, 10 loading roller conveyors, mount platforms and pitches. One two-storied band transporter for the sorting and packaging. The project took about 4 months. All equipment was made from material suitable for direct contact with foodstuffs.

881 projekto Layout
881 gamyba
881-transporteris
881 ilgasis transporteris